and Steel Buildings Build and Buy Online!
Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Pre Engineered Metal BuildingsDeciding to use a pre-engineered metal building is a wise choice. But, there is important information you will need to provide to the manufacturer in order to have your new steel building to be designed to precise specifications. Understanding your building needs and restrictions can help when you consult with a steel building manufacturer. A few questions you need to ask yourself once you decide to buy a metal building system. What are my size limitations? What will the building be used for? What special building requirements are needed? Why the answers to these questions are so critical is that they expose precisely what kind of pre-engineered building system will satisfy your needs. Metal church buildings have very different structural demands than those of mini storage buildings. If investing money into a pre engineered metal building system it only makes sense to research all options. Perplexed about where to start? Contact a manufacturer; they will ask you the right questions to get what information they need to suitably determine your building needs. They can also help you review your requirements to equip your structure with the appropriate interior and exterior features. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Frame TypesUnlike any of our competitors, we allow you to price all building frame types. Select from Clear-span or Modular rigid-frame buildings. We allow you the full flexibility to choose Gable, Single Sloped or Offset Peak building shape. By far, we offer the widest selection of building and frame types. For options not available through the online system, you will need to request a special quote. Clear-span Frames - A clear-span rigid frame offers strength and economy. Since no interior supports are necessary, this design is best when you require large areas of clear and uninterrupted space. Factories, warehouses and agricultural buildings are just a few building types that may utilize a clear-span frame building. A clear-span design does have size limitations. As the desired width increases, the frames will become larger and heavier to carry greater loads across the length of the frame. At some point the cost will outweigh the benefit. Even so, clear-span buildings are still effective for buildings as wide as 150' feet and wider in some cases. Modular Frames - Modular frames use interior columns to evenly distribute the load; reducing the cost of both the frame and foundation of extra wide buildings. The economical advantages become obvious when a building width is about 100' wide or wider. As a result, almost all buildings 100' wide or wider have interior support columns. Modular designs are often used for large factories and warehouses. Single Slope Frames - Single slope frames have high and low eave heights creating a roof that "slopes" from side to side. To select a single slope design, you specify one eave height and define the roof pitch. Single slope designs are frequently used for strip shopping centers, offices, and RV/Boat storage facilities. Just about every steel building has at least one framed opening. It is not unusual for buildings to have several openings. Most openings are created for an overhead door, but can be used for the installation of glass fronts or other entries. Most other online sellers offer "field located" framed openings, which require cutting and fabricating on the job site. Metal Building Depot always provides factory-located openings unless your project requires something otherwise. Installation and Selection of InsulationWe provide the highest quality products available. However, proper installation and selection is imperative for maximum effectiveness. Please refer to installation instructions to ensure correct procedures are used. Facings that have been torn or punctured are no longer capable of blocking water vapor and may eventually do more harm than good. Be sure to quickly patch any holes in the vapor barrier. When selecting a facing, special consideration should be given to its reflective quality. A facing with high reflectivity reduces the need for high light levels in work areas. This results in reduced energy costs and increased productivity. Although the fiberglass insulation itself is not affected by cold weather, the facing is. Colder temperatures can cause cold crack, a situation where the facing becomes brittle and if handled can crack. Bay Insulation recommends that vinyl faced fiberglass products never be installed in temperatures below 40 degrees. Thank you for visiting us. We provide the best service and prices when shopping for metal buildings or steel buildings. |